Slow going but preparation is the key

It may be the summer holidays but work continues at the back of school to prepare for The Big Build.

Not much to report so it looks like it's taking its time... which it is... but that's because there's a lot of preparation needed before the mobile classrooms are moved. After that, work can…

read more...

Posted by Mr P Sharpe on 20 July 2015

Category: The Big Build


Dirt Piles

Preparation is still underway for the moving of the mobile classrooms. It's very much a building site now will piles of dirt appearing on, what used to be, our rear car park.

 

read more...

Posted by Mr P Sharpe on 6 July 2015

Category: The Big Build


Setting Up Shop

The builders are in the process of setting up their compound at the back of school - fences have been removed, the car park has been cleared of staff cars and security fencing has been installed. It's safe to say, this part of school is no longer ours. After setting up, the next stage will be…

read more...

Posted by Mr P Sharpe on 29 June 2015

Category: The Big Build


No Entry! - Construction in progress

Today marks the start of a year long construction project at St Peter's.

At the back of the school site, the builders are starting to move in ready to begin construction of a brand new 2-storey extension to our current school layout. This new building will house an array of new classrooms,…

read more...

Posted by Mr P Sharpe on 22 June 2015

Category: The Big Build


Nearly finished

After weeks of remodelling and construction, our new entrance and reception area is very nearly complete.

The new entrance is now fully complete with brand new doors, an impressive canopy displaying the school name and logo and an open area to the front
Once through…

read more...

Posted by Mr P Sharpe on 27 May 2014

Category: New Reception


Welcome

The work outside of the new reception is well under way. The new entrance doors are in position and an entrance canopy is now up. The area at the front is soon to be finished and it will start looking more like an entrance. The next thing will see is our new signage welcoming visitors!

Almost…

read more...

Posted by Mr P Sharpe on 1 May 2014

Category: New Reception


This Way To Reception

During the Easter holidays, activity around the new reception area hasn't stopped.
Final preparations have been made for decorating to begin, the new front doors have been added and the outside area is starting to be worked on.

Within the week, we'll start to see more activity outside the…

read more...

Posted by Mr P Sharpe on 22 April 2014

Category: New Reception


Taking shape

Walking around the new reception area, it's difficult to imagine what the old rooms used to look like. However, it's now clear to see what will meet our visitors as they walk through the new entrance.

Visitors will walk in and report to the reception window on the right, after which they can be…

read more...

Posted by Mr P Sharpe on 4 April 2014

Category: New Reception


Our Trip To Geneva

Hello! This is Adam, Alex, and Connor from St. Peters Catholic High School and we are here to tell you about our great trip to Geneva, Switzerland. On a classic English night (cold and rainy) around 25 students had to get themselves out of bed at about 2am in the morning and make their way to…

read more...

Posted by Mr P Sharpe on 2 April 2014

Category: Trips


Hole In The Wall

Now the new walls are in place and we have an idea of how the new reception is going to look, it has been time to set to with the new entrance.
So much so, St Peter's has a small hole where windows used to be. Very soon, this hole will house a fancy new entrance for our visitors.

 

read more...

Posted by Mr P Sharpe on 24 March 2014

Category: New Reception